In this second blog dedicated to the phases that characterize the EPC photovoltaic process, after analyzing the first phase of engineering, we will describe the procurement one.

The procurement is necessarily linked to the supply of materials and services, thus the supply of all components that will become part of the previously designed photovoltaic system and the possible use of service providers (subcontractors and/or project workers).

With the globalization of markets and with the growing interest in renewable energy, a buyer will certainly find it difficult to look at the pros and cons of a supply of photovoltaic components and/or services that diversify more and more year after year, as well as necessarily having the technical and linguistic knowledge that will enable him to choose the most suitable and safe components as well as performers for the photovoltaic project he will build.

Also at this stage it becomes crucial to have as a partner a photovoltaic company capable of managing and solving this complexity within the shortest possible time and offering the customer top quality components at the most competitive prices, accompanying it step by step towards the last phase of the EPC process, that of the construction of the photovoltaic system.

The key to the procurement phase are: quality (of product/service), reliability (of the supplier) and costs (always looking for the best ratio between efficiency/quality/price).

The procurement flow is divided in two different cases: purchasing of pv components and services. In this process several departments are involved.

Procurement for PV Components

Purchase Requisitions – The starting point is the pv components needs, listed in a technical document (the Purchase Requisition – PR) drawn up by the Project Manager (PM) and used to formalize the various requirements of the solar project.

Quotations – AII the PR approved are managed by the Procurement Office that must find the best purchasing condition for the pv components respecting the main technical business constrains. The Procurement Office is responsible for vendor management activities: selection of the suppliers, request for quotation (RFQ) and management of the tender activities.

Outline agreements/Contracts – When the Procurement Office finds a particular favourable condition of concluding a long-term accord with a supplier, this agreement is formalized through a Contract or a Purchase Order (PO). This Contract/PO must be approved according with the Power of Attorney (POA) and then will be sent to the vendor.

Logistics lnvoice Verification – Once received the material by the vendor, the logistics operator posts the Goods Receipt (GR) in the system. The Controlling Department then perform the invoice verification activities by controlling the GR data with those present in the vendor invoice.

Inspection and Expediting – During the production phase in the supplier factory, our inspectors assist to the complete process, starting from the purchase of the raw materials, through all the manufacturing phases, until the packaging and shipment of the goods.

epc-procurement-phase

Procurement for Solar Services

The procedure for purchasing services is the same as that for components up to the sending of the PO to the vendor.
The services will be performed by the vendor and the requestor needs to check that the activities are correctly performed according with Milestones of the Contract that are accurately defined before to proceed with the contract signature, and will post the GR in the system.
The controlling office then perform the invoice verification activities by controlling the GR data with those present in the vendor invoice.

Inspection and Expediting – During the realization of the solar project, the sub-contractors are controlled by our operators to assure the respect of the Milestones.

Next week we will analyze the construction phase of the photovoltaic EPC process.

Articoli correlati

2018 Renewable energy statistics in Italy
23 July 2019
The legislation of photovoltaic systems in Italy and the new FER 1 Decree
8 July 2019
Challenges of Utility Scale Solar PV Projects
3 June 2019
Self-consumption and electricity sales options for photovoltaic systems
25 May 2019
The advantages of industrial rooftop photovoltaic systems
20 May 2019
The importance of choosing a qualified solar EPC contractor
3 May 2019
How much energy does a solar photovoltaic panel produce?
1 April 2019
Utility Scale Solar farms are seeing exponential growth
20 March 2019
MENA Solar Energy Outlook 2019
23 January 2019
Enerray’s expanding business in MENA
9 January 2019
Algeria starts its renewable energy future with a 150 MW solar PV tender
17 December 2018
Oman will build the largest solar park in the region
12 November 2018
Utility Scale Solar PV Parks in UAE and Gulf Area
17 October 2018
Commercial and industrial rooftop solar systems in UAE and Gulf Area
25 September 2018
Design and construction of photovoltaic shelters
20 September 2018
In Dubai is borning a sustainable city powered by renewables
30 August 2018
Tunisia plans to improve its economy and invest in green energy
28 August 2018
MENA Region Solar Energy Oulook 2018
24 July 2018
The Benban Solar Park shines Egypt’s renewable energy targets
17 July 2018
Shams Dubai program and DEWA’s initiatives to increase solar power in Dubai
22 June 2018
Solar power, an optimal source of energy in places where there is lack of water
11 June 2018
How a PV system works?
30 May 2018
Socio-Economics Benefits from Renewable Energies – MENA Region
22 May 2018
What are the advantages and disadvantages of solar energy?
18 May 2018
The transition to a fully renewable powered energy system in Southeast Asia
14 May 2018
How does solar energy work and how can it be converted into electricity ?
10 May 2018
The transition to a fully renewable powered energy system in Latam
20 April 2018
The transition to a fully renewable powered energy system in the MENA region
30 March 2018
A global transition to 100% renewable electricity is feasible
26 March 2018
Photovoltaic Energy spreads in the emerging economies. Focus on Latam countries
15 February 2018